Vicarious performance
|
'Vicarious performance' refers to the carrying out of contractual obligations by a person who is not party to a contract, usually by sub-contract or assignment. So, for example, performance by a sub-contractor constitutes vicarious performance on behalf of the main contractor, who remains fully responsible for the work, except where the main contract provides otherwise.
Whether the contractor is allowed to delegate vicarious performance of either all or some of their obligations to a third party will depend on the terms of the contract.
Vicarious performance of the work and whether it is permitted is usually decided based upon whether it either:
- Does not matter who does the work.
- Or, the contract expressly prohibits it.
Where the work is of a non-specialist nature, the right of the contractor to employ a sub-contractor is normally implied.
British Waggon Co. & Parkgate Waggon Co. v. Lea (1880), is often viewed internationally as being the authoritative case. The original contractor (Parkgate) contracted to keep railway carriages in repair for Lea & Co. over a number of years. The original contract did not call for the repairs being necessarily effected by the Parkgate company itself, but could be undertaken by any company capable of completing the works to a similar standard. The Parkgate Company had arranged with the British Waggon company that the latter should execute the repairs. Therefore, on liquidation of Parkgate, the benefit and burden of the contract was assigned to British Waggon. Lea could not refuse performance despite the assignment.
Cockburn CJ stated: 'All that the hirers, the defendants, cared for in this stipulation was the wagons should be kept in repair; it was indifferent to them by whom the repairs should be done. Thus if, without going into liquidation, or assigning these contracts, the company entered into a contract with a competent party to do the repairs, and so procured them to be done, we cannot think that this would have been a departure from the terms of the contract to keep the wagons in repair.'
The ruling on this case was based on the fact that Parkgate was originally bound by the contract to undertake the repairs, thereby producing a result (not necessarily by its own efforts) but, if it wanted to, by vicarious performance through a sub-contractor or otherwise. By getting the repairs satisfactorily completed by a third party, Parkgate had discharged its obligations of repair under the contract.
NB: The British Waggon ruling may not apply where the contractor has been chosen for their specialist skills, reputation and ability to perform complex operations efficiently.
The contractor's liability for the defaults of the sub-contractor may arise in either tort or in contract.
[edit] Related articles on Designing Buildings Wiki
- Assignment.
- Back-to-back provisions in construction contracts.
- Common law.
- Construction contracts.
- Contractor.
- Contractor vs supplier.
- Domestic sub-contractor.
- Named specialist work.
- Named sub-contractor.
- Nominated sub-contractor.
- Sub-contractor.
[edit] External references
- 'Construction Contract Law: The Essentials', ADRIAANSE, A., Palgrave MacMillan (2005)
Featured articles and news
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
A brief run down of changes intentions from April in an onwards.